I am aiming to transfer an old agricultural animal house into a garden room. This has a concrete floor that has a deep slant at the lowest part would be 6 to 8 inches of difference.
For me to level this can I use hardcore placed in the lowest area before cementing?
The layer of original cement at the lowest point can I put primer onto this before adding new cement on top or will this all need broken up/removed prior to adding a new cement layer?
Thank you in advance.
For me to level this can I use hardcore placed in the lowest area before cementing?
The layer of original cement at the lowest point can I put primer onto this before adding new cement on top or will this all need broken up/removed prior to adding a new cement layer?
Thank you in advance.