189756EA-3AFA-4E98-AD0F-D0AD20E4A231.jpeg 3937154F-0D5C-4298-99AD-A14F6B67D70C.jpeg Hi all I have got a ceiling mounted lat pull down machine and need some advice on fixing it to joists . I have already double strengthened the joists so now have 3 x 50mm thick coach bolted together which is only 9 foot wide . I need to fix the machine to the joists now and it comes with Bulgy screws M8 . I’m not 100% happy that these are going to be any good . The machine can lift 120kg . Hope someone can help .
 