right here it goes
got quote for a two story extension that included all basic fixtures and fittings included in the plans, we had several additional extras that we were made aware of at the time and we kept a running total of these,we paid the builder in three payments covering the original quote, when the builder came with the bill for the extras that we had requested it was 3 grand more than we were expecting, he went on to say that he really needed the job at the time at didn't allow enough for the sparky and plumber, where do i stand with this? am i liable for this or only for the extras that aren't on the plans, i will also say that he is a top guy and we were very happy with the job and i dont want any ill feeling to come of this, but 3b grand is three grand!!
got quote for a two story extension that included all basic fixtures and fittings included in the plans, we had several additional extras that we were made aware of at the time and we kept a running total of these,we paid the builder in three payments covering the original quote, when the builder came with the bill for the extras that we had requested it was 3 grand more than we were expecting, he went on to say that he really needed the job at the time at didn't allow enough for the sparky and plumber, where do i stand with this? am i liable for this or only for the extras that aren't on the plans, i will also say that he is a top guy and we were very happy with the job and i dont want any ill feeling to come of this, but 3b grand is three grand!!