Gravel fire pit

JWK

Joined
Sep 30, 2022
Messages
1
Reaction score
0
Country
United States
Have built a firepit on a slope from a concrete slab. Block wall height is 36” at its highest, so this means at the wall I have about 36” of gravel. I want to install fencing along the wall for safety reasons. So about 36” of gravel before I get to soil. Need suggestion on type of post and install method
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Top