Floor screeding is a FAR more highly skilled job than you may think. If you are determined to have a go, The mix needs to be dry-ish. A band is laid next to the walls, and levelled, then the area between is filled in, compacted and levelled, using the the bands as a guide.
I don't think I've explained it that well, but I really would suggest getting professional help, usually a plastering contractor.