I am building a 12x12 shed on 4ea treated 4x4 skids with a subfloor using treated 2x4's on 16" centers, and 3/4 plywood floor. I want to use 2x4's to keep the shed to ground level lower. From what I have been reading, a 2x4 can support the 4ft spread between the 4x4 skids. Anyone see an issue with this?
thanks
Dean