Leveling lot for pole barn

stryped

Usenet Archive
Joined
Nov 29, 2004
Messages
216
Reaction score
0
I have been working over the last few months an area for a 24x32 pole barn. I have been tilling with a tractor tiller and scraping with the tractor bucket.

I am wanting to start on it again. It seems about 7 inches off from the highest spot to the lowest. The ground is hard now.

What would be the best way to do this? It is hard for me to eyeball. I am using string and a line level.

I guess what I am asking is should I keep using the tiller or should I have dirst brought in and try to build it up to level? Expense is a major concern as I have a new baby at home and we are going to have to buy another vehicle soon.
 

Nick Müller

Usenet Archive
Joined
Jun 22, 2005
Messages
13
Reaction score
0
What would be the best way to do this?
Don't know how you call it, but in German we call it "hose level". fill some transparent plastic hose with water and you have a level with unlimited length. That is if you hold the ends upright and don't close the ends. Ancient Roman technique.

HtH,
Nick
 

PoP

Usenet Archive
Joined
Aug 30, 2003
Messages
2,278
Reaction score
0
I have been working over the last few months an area for a 24x32 pole barn. I have been tilling with a tractor tiller and scraping with the tractor bucket.

I am wanting to start on it again. It seems about 7 inches off from the highest spot to the lowest. The ground is hard now.

What would be the best way to do this? It is hard for me to eyeball. I am using string and a line level.

I guess what I am asking is should I keep using the tiller or should I have dirst brought in and try to build it up to level? Expense is a major concern as I have a new baby at home and we are going to have to buy another vehicle soon.
An actual Pole Barn, right? I'm afraid I fail to see, or understand, how tilling the ground has anything to do with what you're trying to accomplish. So, either I misunderstand or you need to provide a lot more detail about whatyou're trying to build and how. Tilling is not a reliable way to move dirt around for levelling because it'll compress unevenly afterwards. Are you planning a bare dirt floor?

Cheers,

PopS
 

stryped

Usenet Archive
Joined
Nov 29, 2004
Messages
216
Reaction score
0
I am tilling the ground then scraping away the loose dirt with a front tractor loader.
 

stryped

Usenet Archive
Joined
Nov 29, 2004
Messages
216
Reaction score
0
I have read about this and I must be stupid but I dont understand how to make it work. People have tried explaionging it. Is it messey?
 

Duane Bozarth

Usenet Archive
Joined
Jan 2, 2002
Messages
1,556
Reaction score
0
I am tilling the ground then scraping away the loose dirt with a front tractor loader.
You'll never (or at least are unlikely to) get a good final grade until you get a leveling blade or at least a box blade you can put some skids on. Got a neighbor you can borrow from?
 

G Henslee

Usenet Archive
Joined
Mar 12, 2005
Messages
921
Reaction score
0
I am tilling the ground then scraping away the loose dirt with a front tractor loader.
Why? You obviously don't have a clue and aint gettin' one here, so perhaps you should call a pro in to look at your project.
 

maradcliff

Usenet Archive
Joined
Jun 30, 2003
Messages
1,018
Reaction score
0
Get yourself one of those $10 laser levels. Sit it on a 4x4 or other wooden block, or bricks. Get it level and carry a yard stick along the light beam to find the high spots.Remember to add the thickess of the block under the level.

For a barn that size, 7 inches off is not all that bad. You may want some slope toward the door. Depends on what you are going to use it for. Assuming you are using center match (tongue and groove 2x6's) along the bottom, add a board or two at the lower end. You could always get a load of dirt and build up the low end somewhat at the end of the job.

I have built several pole barns and done so in hilly areas. Livestock dont care that my barn is a foot higher on one end. Just level the posts to be accurate to "true level", build it, put on your steel siding and add more center matched boards on the low end. I always have at least 6" of these boards below the ground. As it goes uphill, I just eliminate one board and step them up.

If your use will be for a garage, you may want to pour gravel inside to raise the floor above the outside soil level or you may have water running inside. Or, cement floor. I have a ditch outside mine, Just a simple hand dug thing about a foot wide and 5 inches deep. Of course mine is for livestock use.

Mark
 

Dave Hinz

Usenet Archive
Joined
Aug 26, 2003
Messages
43
Reaction score
0
I have read about this and I must be stupid but I dont understand how to make it work. People have tried explaionging it. Is it messey?
Nobody knows what you mean by "read about this" because you don't include any context to show what or who you're responding to.
 

stryped

Usenet Archive
Joined
Nov 29, 2004
Messages
216
Reaction score
0
Not really. Might be able to buy a box blade. What is a leveling blade and how do you use it?
 

G Henslee

Usenet Archive
Joined
Mar 12, 2005
Messages
921
Reaction score
0
Duane said:
You'll never (or at least are unlikely to) get a good final grade until you get a leveling blade or at least a box blade you can put some skids on. Got a neighbor you can borrow from?
Don't feed the trolls. You'll see what I mean.
 

G Henslee

Usenet Archive
Joined
Mar 12, 2005
Messages
921
Reaction score
0
Karl said:
So how deep should you dig the post holes? <VBG>
Dpends upon the building height, but standard for troll bridge supports is 36".
 

Ernie Post

Usenet Archive
Joined
Jun 22, 2005
Messages
2
Reaction score
0
"Lloyd E. Sponenburgh" wrote
Or, you can build the barn on the stand as-is, and proceed to fill and level piece-meal as you have money and time. One of the advantages of a pole barn is that it's an open structure until you decide to close it in. That means you can do a lot of the work normally done up-front after the structure is up. Leveling, placing a slab, enclosing bays -- all can be done after the poles and roof are in place. You can even do it one bay at a time, if you're so-inclined.
Building a pole barn on an out-of-level lot is a lot easier than it sounds. You get poles that are longer than you need by at least the greatest height out of level. You sink them all to the prescribed depth (as discussed at length in other threads here).

Then you secure your collar beams level on the poles, and cut off the tops of the poles after the fact. You'd end up doing that anyway, even if the lot were perfectly level, because it's hard to get all the poles buried so precisely that all the pole tops are level with one-another. Better to seat them without paying too much attention to precision depth, but well and hard - so settlement won't occur unevenly - then trim them all to finished height.
Bingo
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Similar Threads

Leveling a charcoal grill 1
Leveling a basement floor 1
Leveling uneven/sagging floor 1
Leveling floor 0
Leveling Appliances 1
concrete floor leveling 0
Self-leveling over SBR.ed concrete? 6
Leveling Floor Part 2 4

Members online

No members online now.

Forum statistics

Threads
144,906
Messages
1,592,100
Members
59,482
Latest member
lisac

Latest Threads

Top